
Picking up stitches without a wavy band
Use the finished body and band gauges to plan a straight edge, then check the joined fabric.
7 guides and workflows

Use the finished body and band gauges to plan a straight edge, then check the joined fabric.

Start with three original 200 m balls: 600 m. A replacement labeled 150 m/50 g needs five balls with a chosen 10% reserve. Confirm fabric suitability before committing to the quantity.

Keep one complete length budget for each yarn. For 400 m of working length plus 10% reserve, both A and B need 440 m, then their package quantities round separately.

A sample changing from 10 × 10 cm to 11 × 9 cm grows 10% in width and shrinks 10% in height. A comparable 50 × 60 cm piece projects to 55 × 54 cm.

A useful color budget records each color’s own consumption. In this example, two A components need 120 m and 80 m, while B needs 60 m. With 10% reserve and 100 m balls, the result is three A and one B.

For a relaxed rib sample measuring 20 stitches and 30 rows per 10 cm, a 20 × 150 cm scarf starts from 40 stitches and 450 rows. Confirm edge treatment and stretch before choosing the final counts.

Along 120 body rows, a body gauge of 30 rows per 10 cm and a band gauge of 20 stitches per 10 cm suggest 80 picked-up stitches: approximately two stitches for every three rows.