Explore guide
Plan needlepoint from canvas count
For one stitch per canvas intersection, design size follows stitch count divided by canvas count. Allow extra canvas for the frame and finishing separately.

Related lessons and tools
For one stitch per canvas intersection, design size follows stitch count divided by canvas count. Allow extra canvas for the frame and finishing separately.
Before you start
Have the chart key, chart width and height, fabric thread count and threads crossed by each stitch. Keep floss strands separate from fabric threads.
Try this example
A 120-intersection width on 12-mesh canvas spans 25.4 cm. Verify the actual canvas both ways before cutting, since the surrounding mounting allowance is not part of that design width.
Check your result
- Count from two independent reference points before filling a large area. Verify the outer stitched dimensions on the actual ground; include finishing fabric separately.
- Changing fabric count changes physical size, not chart complexity. Fractional stitches, mixed scales and non-square grounds need explicit chart instructions.
Sources

Cross-stitch fabric planner
Turn chart stitches and fabric count into finished and cutting dimensions.
Before you use this tool
Count chart squares, not centimetres. Fabric threads crossed per stitch means over-one or over-two; it is separate from the number of floss strands.
The design size excludes finishing margins; the cut size includes your chosen margin on all four sides.
Method and limits
Formula and assumptions
Design size equals chart stitches divided by effective stitches per unit. Choose one fabric thread per stitch for over-one or two for over-two; the selected or custom margin is added on every side.
Worked example
Example: 140 × 98 stitches on fabric with 55 threads/10 cm produces a 25.5 × 17.8 cm design; a 5 cm margin needs a 35.5 × 27.8 cm fabric cut.
Limits and rounding
Results are planning estimates from the values entered. Displayed decimals are rounded for craft use; whole materials and repeats round up where the method says so. Confirm gauge, material behavior, construction, and finished measurements before committing supplies.