A 12 cm joined square repeat gives 150 squares in a 120 × 180 cm field. With 5% spares, make 158. A timed sample of two complete squares in 30 minutes gives 39.5 hours before time allowance.

Related lessons and tools
A 12 cm joined square repeat gives 150 squares in a 120 × 180 cm field. With 5% spares, make 158. A timed sample of two complete squares in 30 minutes gives 39.5 hours before time allowance.
Work through the example
- Choose a motif instruction and make enough squares to test joining in both directions. Finish the sample and confirm the 12 × 12 cm joined pitch.
- Define the motif field separately from any border. Enter its dimensions, choose cover or complete-only fitting and record the 10 × 15 layout.
- Transfer the number to make to the time planner. Keep the sample unit as complete squares; a 15% time allowance gives about 45.43 hours here.
- Measure yarn used by each color in the sample, plus joining and border yarn separately. Scale by actual motif and seam counts, not by the blanket’s photograph.
- Print layout, spare count, color quantities and assembly order. Join a small panel early to confirm size before making the full set.
Check before committing
This workflow assumes equal rectangular repeats. Its time covers the sampled square work; schedule joining, ends, border and drying separately. It is not a complete blanket pattern.
Printable planning record
Inputs and sample measurements recorded; chosen result checked; material/color references recorded; reserve included once; construction and finishing checks completed.
Method and sources
These are original planning examples using the linked tools’ methods. Replace measured inputs with your own samples; a calculator cannot validate the construction. Keep the resulting measurements, choices and remaining checks with the project.

Motif layout planner
Turn a measured, joined motif repeat into rows, columns, and a make count for a rectangular project.
Before you use this tool
Join and finish several sample motifs before measuring the repeat pitch between matching points. Enter the motif field after subtracting borders.
Cover rounds up each axis; complete-only rounds down. Extra motifs are spares outside the layout.
Extra outer-edge allowance is added twice to each target dimension. Internal joins belong in the measured motif pitch.
Method and limits
Formula and assumptions
Required field = target width/height + twice the outer-edge allowance. Divide each axis by the finished joined motif pitch, swapping axes when rotated. Cover rounds up; complete-only rounds down. Multiply rows by columns, then add the rounded-up spare percentage. This model covers aligned rectangular layouts.
Worked example
Example: a 10 × 10 cm joined repeat covering 95 × 135 cm needs 10 columns × 14 rows = 140 motifs; 5% allowance means making 147.
Limits and rounding
Results are planning estimates from the values entered. Displayed decimals are rounded for craft use; whole materials and repeats round up where the method says so. Confirm gauge, material behavior, construction, and finished measurements before committing supplies.
Sampled project-time estimator
Scale a timed sample into a realistic working estimate with your own allowance.
Before you use this tool
Time a representative count of the same units used for the target: stitches, rows or motifs. Include assembly separately if the sample omits it.
Avoid adding breaks twice. The central estimate and range support scheduling; they are not a deadline guarantee or an assessment of skill.
Method and limits
Formula and assumptions
Observed minutes per unit are scaled to the target, selected complexity factor, and break allowance. The result shows a ±15% planning band for ordinary pace variation. Use comparable sample and project units; include breaks in the sample or allowance, but not both.
Worked example
Example: 50 units in 20 minutes, scaled to 500 units plus 15%, gives a 3.3–4.4 hour planning range around a 3.8 hour central estimate.
Limits and rounding
Results are planning estimates from the values entered. Displayed decimals are rounded for craft use; whole materials and repeats round up where the method says so. Confirm gauge, material behavior, construction, and finished measurements before committing supplies.