# [Budget two different yarns held together](https://threadcabin.com/explore/65/budget-two-different-yarns-held-together)

> For 400 m of working length with one strand of each yarn and 10% reserve, yarn A and yarn B each need 440 m. Their lengths cannot be pooled.

- Canonical page: https://threadcabin.com/explore/65/budget-two-different-yarns-held-together
- Language: en
- Published: 2026-09-25T17:26:32.8793716+00:00
- Updated: 2026-09-25T17:26:38.2120806+00:00
- Primary image: [Budget two different yarns held together — measured quantities](https://threadcabin.com/images/learning/s35-plan.png)

For 400 m of working length with one strand of each yarn and 10% reserve, yarn A and yarn B each need 440 m. Their lengths cannot be pooled.

## Work through the example

1. Record each label separately: A has 100 m/50 g; B has 200 m/25 g. Select one strand of A and one of B.
2. Round separately: five balls of A provide 500 m/250 g; three balls of B provide 600 m/75 g. The combined purchased mass is 325 g.
3. Sample the pair, including the intended finishing method. Check whether one strand stretches, sheds or changes size differently.

## Check before committing

This model assumes both yarns run together throughout. A contrast strand used only in selected areas needs a separate component budget.

## Method and sources

These are original planning examples using the linked tools’ methods. Replace measured inputs with your own samples; a calculator cannot validate the construction. Keep the resulting measurements, choices and remaining checks with the project.

- [CottonWorks: Yarn Spinning, Twist and Ply](https://cottonworks.com/learning-hub/yarn-manufacturing/yarn-spinning/)
- [CottonWorks: Textile Yarns](https://www.cottonworks.com/wp-content/uploads/2017/11/Textile_Yarns.pdf)

[Report a correction](/corrections).

[Browse editable craft templates](/crafts)

## Sources and provenance

- [Yarn twist and ply: structure before stitch](https://threadcabin.com/explore/7/yarn-twist-and-ply-structure-before-stitch)
- [Held-together yarn planner](https://threadcabin.com/tools/held-together-yarn-planner)

## [Held-together yarn planner](https://threadcabin.com/tools/held-together-yarn-planner)

Plan label-based quantities for one or two yarns held together. Enter the working length needed by each strand, not an already combined total.

Enter the working length needed by one strand, not the combined length of every strand. Select how many strands of A and B run throughout.  Each strand consumes the full working length; B can be zero. This estimates separate packages, not the combined yarn weight category or gauge.

Each working strand needs the entered length plus allowance. For each yarn, multiply that length by its strand count, divide by label length, and round up to whole balls. Total purchased mass is the sum of each ball count × label mass. It assumes all strands run together throughout; estimate separate sections separately.

- Required length per working strand: 400 m
- Extra allowance: 10 %
- Length per ball: 100 m
- Weight per ball: 50 g
- Strands held together: 1
- Length per ball: 200 m
- Weight per ball: 25 g
- Strands held together: 1
